国产成人精品一区二区三区电影,亚洲色图吧,中文天堂在线观看,极限特工1电影完整版在线观看,日韩高清一二三区,色戒未删完整版电影,夏日情人完整版未删减在线观看

軟題庫 學習課程
試卷名稱
考試中心《》在線考試
試卷年份2009年上半年
試題題型【單選題】
試題內(nèi)容

Many of the activities performed during the preliminary investigation are still being conducted in(1 ), but in much greater depth than before. During this phase, the analyst must become  fully aware of the(2 ) and must develop enough knowledge about the(3 ) and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4 ) for process and data of current system, the deliverable from this phase also includes the(5 ) for the proposed system.
(1)A. analysis phase
B.  design phase
C.  implementation phase
D. maintenance phase
(2)A. main symptom
B.  root problem
C.  final blueprint
D.  data specification
(3)A. hardware environment
B. testing environment
C. software environment
D. business environment
(4)A. logical models
B. physical models
C. design models
D. implementation models
(5)A. hardware and software specification
B. system performance specification
C. formal requirements definition
D. general problem statement

查看答案

相關(guān)試題



更多試題